Hook DeLoft Posted November 20, 2020 Posted November 20, 2020 I know we've talked about this before but I thought I would share Ping's estimated delivery of i210 iron sets--14 weeks. The rep I spoke to said the delay was in getting the heads. The shafts weren't the problem. At least, not the shafts I was interested in. 14 of the following: Taylormade Qi10 Max Callaway 2023 Big Bertha 3 wood set to 17 degrees Cobra F9 Speedback 7/8 wood set at 23.5 degrees Callaway Epic Max 11 wood Titleist TSR1 hybrid 26 degrees Ping Eye 2 BeCu 2-SW Ping G430 irons 6-50 degree Sub 70 286 wedges 52 and 56 degrees Hogan sand wedge 56 degree bent to 53 Ping Glide 3.0 Eye2 58 degree Ping Glide 3.0 60 degree Evnroll ER1v Ping Sigma 2 Anser Cheap Top Flite mallet putter from Dick's TaylorMade Mini Spider Bridgestone XS
ChitownM2 Posted November 21, 2020 Posted November 21, 2020 That's rough. It has to be they just haven't recovered inventory levels of the hardware yet from the shutdowns. I ordered a G400 crossover last month and got it in ~ 17 days so I think they are getting whatever they can out the door, but my guess is the increased demand for golf combined with the virus shutting down China all those months ago they just don't have the parts to make all of these clubs.
heavygolffeels Posted November 30, 2020 Posted November 30, 2020 I've heard that it is wise to ask about the exact reasons for delay. In some cases it was because they were waiting on a single iron head (usually the 4 iron) and you could talk them into shipping the partial order. GARSEN GRIP TESTER Driver: PING G400 MAX, Ventus Blue 6x Woods: COBRA F6 Baffler AD DI 8S Hybrid: CALLAWAY Apex Pro, Ventus Blue 8s Irons: SRIXON ZX5 mk2 5-6, ZX7 mk2 7-PW, Modus 120x Wedges: EDEL 50 C grind, 54 V grind, CLEVELAND 60 RTX6 Low Putter: YES Abbie!
Ohio Posted December 1, 2020 Posted December 1, 2020 Ordered a custom set of G410 irons on 8/21 through Global Golf...still waiting, thinking I might end up getting them after the G445’s are introduced.
RollingGreens Posted December 20, 2020 Posted December 20, 2020 I was quoted 15 days, 15 days turned to 3-4 weeks from the initial order time. All said and done just shy of 6 weeks. Albeit mizuno not Ping. Stealth 2 Plus 9deg Kai' li Red Stealth 2 13deg Aldilla Rogue Silver Stealth 2 15deg Aldilla Rogue Silver JPX 921 Hot Metal 4-PW Nippon Modus 120s SM8 54 and 58deg Dynamic Gold Wedge Flex Scotty Cameron Newport 2 Titleist ProV1 Hoofer Stand Bag Stewart Q Follow Electric Caddie 300 PRO Rangefinder Official Nippon Regio B+ Driver Shaft Review Official Stewart Q Follow Review