timyoon123 Posted May 4, 2021 Share Posted May 4, 2021 13 hours ago, Golfspy_CG2 said: The cargo ship accident did happen. 3 million parts is a HUGE exaggeration More like thousands. Yes it is a stretch. This is what I’ve heard. Quote Equipment junkie Link to comment Share on other sites More sharing options...
Ron D Posted May 4, 2021 Share Posted May 4, 2021 G425 irons and Glide 3 wedge with UST Recoil shafts took 5 weeks. mikeanthony 1 Quote Link to comment Share on other sites More sharing options...
mikeanthony Posted May 4, 2021 Author Share Posted May 4, 2021 2 hours ago, Ron D said: G425 irons and Glide 3 wedge with UST Recoil shafts took 5 weeks. That works for me! Today is week 4 on the nose ... was quoted a delivery date between May 5th to the 15th when I placed the order. Hope you’re enjoying the new sticks! Quote Driver: G410 SFT 10.5* 3W: Speedzone 14.5* Hybrid: TS2 19* & 21* Irons: Forged Tec One Length (5i-GW) Wedges: T22 55* & 59* Putter: 002 Mid-Mallet Ball: Callaway Chrome Soft LS & Prime-X Link to comment Share on other sites More sharing options...
MadMex Posted May 10, 2021 Share Posted May 10, 2021 Maybe it's me or the age group am in or ???? but, if waiting an extra week or two or 5 for my G425's and the wife's 710's we are about to order is the worse that happens to us all year, life is good. Retiring to AZ this fall M. Parsons, russtopherb, sixcat and 2 others 4 1 Quote DRIVER: Cobra F-8 set at 10.5, Aldila NV 2KXV Blue 60 (R) 44 1/2 " 3 & 5 WOOD: Callaway XR-16, Fujikura Speeder Evolution 565 Red (R) IRONS 5-SW: PING G-700, 2 upright, std loft Alta CB (R) + 1/2" HYBRID 3-4: PING G-410, 1 upright, Alta CB 70 Red (R) + 1/2" PUTTER: Byron Experimental GSS Link to comment Share on other sites More sharing options...
sixcat Posted May 10, 2021 Share Posted May 10, 2021 Today is the beginning of week six waiting for my i210's and Glide 3.0's. Patience is a virtue. I would rather wait for what I want to get here than purchase something else because I can get my hands on it faster. M. Parsons 1 Quote Link to comment Share on other sites More sharing options...
Headhammer Posted May 10, 2021 Share Posted May 10, 2021 We ordered a new dining table and we were told 12 weeks, 15 weeks and still waiting. Part for our stove on backorder with no ETA. What industries are impacted by a pandemic? All of them! russtopherb, MattF and sixcat 3 Quote Driver: Speed Zone 9* HZRDUS Smoke Yellow Shaft 3 Wood: King Speedzone 13.5* HZRDUS Smoke Black Shaft 2 & 3 Hybrids: Speedzone Recoil 480 ESX Shaft Irons: Speedzone 5-GW Recoil 460 ESX Shafts Wedges: PM Grind 54* & 58* Putter: Dual Force Rossi II Ball: Whatever I find in the woods HCP:18 Link to comment Share on other sites More sharing options...
russtopherb Posted May 10, 2021 Share Posted May 10, 2021 1 hour ago, Headhammer said: We ordered a new dining table and we were told 12 weeks, 15 weeks and still waiting. Part for our stove on backorder with no ETA. What industries are impacted by a pandemic? All of them! Yep. I work for a tech hardware manufacturer and we're seeing lead times on parts of nearly 30-40 weeks when a year ago we were talking 8-10, and that was a worst case scenario. It's hitting everyone, everywhere. Headhammer 1 Quote In my Big Max hybrid bag: ST-X 10.5* Kai'li Blue R Flex ST-Z 15* Kai'li Blue R Flex ST-Z 4h Linq Blue R Flex Halo XL 5i-DW CBX 54* & 58* ER5 Tour S Link to comment Share on other sites More sharing options...
RollingGreens Posted May 10, 2021 Share Posted May 10, 2021 On 5/3/2021 at 9:59 PM, Golfspy_CG2 said: The cargo ship accident did happen. 3 million parts is a HUGE exaggeration More like thousands. Off the coast of Hawaii I what the rep had told me. Hopefully it will all be recovered Quote Stealth 2 Plus 9deg Kai' li Red Stealth 2 13deg Aldilla Rogue Silver Stealth 2 15deg Aldilla Rogue Silver JPX 921 Hot Metal 4-PW Nippon Modus 120s SM8 54 and 58deg Dynamic Gold Wedge Flex Scotty Cameron Newport 2 Titleist ProV1 Hoofer Stand Bag Stewart Q Follow Electric Caddie 300 PRO Rangefinder Official Nippon Regio B+ Driver Shaft Review Official Stewart Q Follow Review Link to comment Share on other sites More sharing options...
RollingGreens Posted May 10, 2021 Share Posted May 10, 2021 Coincidentally enough I did a ping fitting over the weekend. I still have to test the callaway and titleist drivers before making a decision but I got an email yesterday saying I ordered the ping. Contacted the club pro to ask him what was going on as I wasn’t ready to make a final decision. He sends an email back saying I’ll have plenty of time to cancel if I go with another driver because of the long lead times. He didn’t throw out a time lines, but the rep said 6 weeks is typical depending on what’s in stock Quote Stealth 2 Plus 9deg Kai' li Red Stealth 2 13deg Aldilla Rogue Silver Stealth 2 15deg Aldilla Rogue Silver JPX 921 Hot Metal 4-PW Nippon Modus 120s SM8 54 and 58deg Dynamic Gold Wedge Flex Scotty Cameron Newport 2 Titleist ProV1 Hoofer Stand Bag Stewart Q Follow Electric Caddie 300 PRO Rangefinder Official Nippon Regio B+ Driver Shaft Review Official Stewart Q Follow Review Link to comment Share on other sites More sharing options...
txgolfjunkie Posted May 10, 2021 Share Posted May 10, 2021 I spoke with a Ping rep over the weekend and while he wouldn't come out and say it, he hinted that grips are one of the biggest delays in clubs right now. You might see a faster ship time if you just mention you'll take whatever grip is available in standard or midsize. Coincidentally, a manager at a local big box store said the word on the street is that Golf Pride will have little to no inventory by July. If you need grips and can find the ones you like, buy them now. As I left his store with about a half dozen golf pride grips in tow, I realized I was either the smartest guy in the world...or the biggest sucker. Regardless, I have 450 grips to go along with my 5,987 rolls of toilet paper. Thanks pandemic! (Just kidding, I only have 9 rolls of toilet paper and I only bought 6 grips. I'm not a hoarder) Headhammer, cnosil and mikeanthony 3 Quote Cobra Connect 5 Competitor - Team Chad King Radspeed 10.5* w/ Hzrdus RDX Blue 60 6.5 tipped 1/2" - Peacoat/Red King Radspeed Big Tour 3 Wood w/ Hzrdus RDX Blue 70 6.5 Tipped 1/2" King Radspeed Tour 5 Wood w/ Motore X F1 70 X Flex King Utility 4 21* w/ Tensei Pro White 100 X Flex King Tour MIM Copper Irons 5-G w/ AMT White X100 Onyx King MIM Black Wedges 55* & 60* w/ AMT White X100 Onyx Spider SR Pro V1x Left Dash Lefty Link to comment Share on other sites More sharing options...
NM01 Posted May 10, 2021 Share Posted May 10, 2021 32 minutes ago, txgolfjunkie said: I spoke with a Ping rep over the weekend and while he wouldn't come out and say it, he hinted that grips are one of the biggest delays in clubs right now. You might see a faster ship time if you just mention you'll take whatever grip is available in standard or midsize. Coincidentally, a manager at a local big box store said the word on the street is that Golf Pride will have little to no inventory by July. If you need grips and can find the ones you like, buy them now. As I left his store with about a half dozen golf pride grips in tow, I realized I was either the smartest guy in the world...or the biggest sucker. Regardless, I have 450 grips to go along with my 5,987 rolls of toilet paper. Thanks pandemic! (Just kidding, I only have 9 rolls of toilet paper and I only bought 6 grips. I'm not a hoarder) It’s no secret that GP grips are a delay. Also Nippon and dynamic gold shafts for irons are a big delay. With woods Fujikura and px were big delays Quote Link to comment Share on other sites More sharing options...
mikeanthony Posted May 14, 2021 Author Share Posted May 14, 2021 Just got confirmation today that my order will ship out on Monday! Which puts the order time exactly a day under 5 weeks. @fixyurdivot did you end up ordering the G425s? russtopherb and RollingGreens 2 Quote Driver: G410 SFT 10.5* 3W: Speedzone 14.5* Hybrid: TS2 19* & 21* Irons: Forged Tec One Length (5i-GW) Wedges: T22 55* & 59* Putter: 002 Mid-Mallet Ball: Callaway Chrome Soft LS & Prime-X Link to comment Share on other sites More sharing options...
FlyingRev Posted May 15, 2021 Share Posted May 15, 2021 I placed an order for Ping g425 irons (4-PW, and 3 Glide wedges all in AWT 2.0 steel and g425 3-wood and g410 driver through my golf instructor. The order was placed May 11th. The irons, wedges and 3-wood was quoted shipping the second week in June. The Driver was quoted as mid August. Quote Hard work beats talent when talent doesn’t work hard Link to comment Share on other sites More sharing options...
alexsmith11 Posted May 25, 2021 Share Posted May 25, 2021 I ordered a set of Ping G425 irons (4-UW) green dot with Alta CB Slate in stiff +0.5" on April 12th. I was quoted 5 weeks at the time of the order, and in the 5th week was called up and told the order would take an additional 6 weeks. Not sure how Ping could have missed the mark by more than the originally quoted delay. Granted, this is during a pandemic and bigger things are going on around the world, but giving someone an extended timeline to begin with and missing it by more than the original quote seems a little amateur and a loss of control on the supply chain and manufacturing timelines. Quote Link to comment Share on other sites More sharing options...
sixcat Posted June 2, 2021 Share Posted June 2, 2021 On 5/2/2021 at 12:09 PM, sixcat said: I ordered i210’s and Glide 3.0 wedges April 5th. Our local Ping rep told my head pro when the order was placed, it would be 8 weeks at least. I thought I would pop back in to this thread to update progress. My wedges arrived May 27. My head pro received email notification yesterday morning that the irons had shipped and would be here later in the week. 8 weeks on the nose! russtopherb 1 Quote Link to comment Share on other sites More sharing options...
FlyingRev Posted June 3, 2021 Share Posted June 3, 2021 UPDATE; I was just informed that my Ping order will now arrive……. Second week in July for Irons, end of June for woods, and driver will be sometime in August. items ordered May 11, 2021, and it was verified that all components are in stock. ‘So it seems we are looking at about 8 weeks now instead of the 4 weeks as originally stated. Quote Hard work beats talent when talent doesn’t work hard Link to comment Share on other sites More sharing options...
mikeanthony Posted June 3, 2021 Author Share Posted June 3, 2021 On 5/14/2021 at 11:31 AM, mikeanthony said: Just got confirmation today that my order will ship out on Monday! Which puts the order time exactly a day under 5 weeks. @fixyurdivot did you end up ordering the G425s? I avoided this thread for I’ve been so frustrated with PING. Was grossly misquoted and misled on that initial shipping confirm ... when I followed up after noticing my credit card wasn’t yet charged, they said it’d be another 5 to 6 weeks. Cxld my order. Ended up ordering Maltby iron heads from GolfWorks ... got them within 2 days. fixyurdivot 1 Quote Driver: G410 SFT 10.5* 3W: Speedzone 14.5* Hybrid: TS2 19* & 21* Irons: Forged Tec One Length (5i-GW) Wedges: T22 55* & 59* Putter: 002 Mid-Mallet Ball: Callaway Chrome Soft LS & Prime-X Link to comment Share on other sites More sharing options...
sixcat Posted June 3, 2021 Share Posted June 3, 2021 Some wildly varying experiences here with Ping orders. Maybe my situation was made better by having everything go through the head professional at my home club?!?!? Our local Ping rep that my head pro goes through was very open, honest and straightforward from the beginning. He said it would likely be 8 weeks and was doubtful that it would be shorter than that. He also reiterated, it could possibly be 10 to 12 weeks. I was fine with the wait because I want what I want. Not something I settle for because what I want may take some time to arrive. Quote Link to comment Share on other sites More sharing options...
sixcat Posted June 5, 2021 Share Posted June 5, 2021 After 36 holes with the new Ping’s, I couldn’t be happier. Well worth the wait! txgolfjunkie and cnosil 2 Quote Link to comment Share on other sites More sharing options...
PaulST Posted August 7, 2021 Share Posted August 7, 2021 Disgraceful further delays - now minimum 5 months and they still won’t confirm Quote Link to comment Share on other sites More sharing options...
NM01 Posted August 7, 2021 Share Posted August 7, 2021 3 hours ago, PaulST said: Disgraceful further delays - now minimum 5 months and they still won’t confirm So it’s disgraceful that they don’t have the components in because there’s a lack of them across all industries so they can’t fill orders? Or is it disgraceful that they also don’t have the number of people working to meet the larger than normal demand for golf clubs over the last year plus? Is it disgraceful they can’t give a delivery time because they can’t control if or when they will get the component needed? Did you ask them what component was holding up the order and if there was something you cold swap to get it sooner? russtopherb 1 Quote Link to comment Share on other sites More sharing options...
Golfspy_CG2 Posted August 7, 2021 Share Posted August 7, 2021 Ordered a G425 driver on 7/10, it shipped on 8/4. less than 4 weeks, I can't complain about that. Ordered 2 G425 FW's for a customer on 6/20 they shipped on or around 7/25, so just over 4 weeks. I think things are getting better there. russtopherb, GolfSpy_APH and NM01 3 Quote G430 Max 10K TSiR1 15.0 Aldlia Ascent 60g TSR2 18.0 PX Aldila Ascent 6og TSi1 20 Aldila Ascent Shafts R T350 5-GW SteelFiber I80 SM10 48F/54M and58K S159 48S/52S/56W/60B Select 5.5 Flowback 35" ProV1 Play number 12 Link to comment Share on other sites More sharing options...
fixyurdivot Posted August 7, 2021 Share Posted August 7, 2021 On 5/14/2021 at 9:31 AM, mikeanthony said: Just got confirmation today that my order will ship out on Monday! Which puts the order time exactly a day under 5 weeks. @fixyurdivot did you end up ordering the G425s? Sorry I missed your post/question. No, I ended up getting the ZX5's and ordered them from Fairway Jockey. They arrived in week 7 of the 6-8 week estimate. The heads were the long lead item and, looking at the Srixon website, they still show not available directly through them due to high demand. Bummer about your continued delay and now cancelled order with PING. The G425's are a nice iron and I really went back and forth deciding. Many of the major OEM's are still struggling with getting control on component inventories and that makes it near impossible to provide an accurate ship to customer date. Having played the G410's now for two years, and having tested the G425's side by side several times and during my True Spec fitting, I can tell you that they are virtually the same. Not sure what shaft and specs you were ordering on the G425's, but maybe think about finding a used set of G410's and having them reshafted? Quote G410 Plus, 9 Degree Driver G400 SFT, 16 Degree 3w G400 SFT, 19 Degree 5w ZX5 Irons 4-AW Glide 2.0 56 Degree SW (removed from double secret probation ) ER5v Putter (Official Review) AI-One Milled Seven T CH (Official Review) Link to comment Share on other sites More sharing options...
ClarkWGriswoldIII Posted August 9, 2021 Share Posted August 9, 2021 I ordered a G425Max 7 wood on 6/19 and I am still waiting, 7.5 weeks out. Quote Aerojet LS driver G425 Max 5-wood G425 Max 7-wood Hot Metal 921, 5-GW, UST Mamiya Recoil 95 Graphite (currently testing New Level 480DB) CBX ZipCore Chrome 52* 56* 60* Wedges HB SOFT 2 Putter – Model 8C Link to comment Share on other sites More sharing options...
Rore Posted August 9, 2021 Share Posted August 9, 2021 I ordered a set of G425 irons, I think in February and they arrived sometime in May, about 3 months later. I ordered a Ping G425 driver and it took about 2 months. I kept asking why it was taking so long, but never really received an answer. Quote Link to comment Share on other sites More sharing options...
Paul Kopp Posted August 9, 2021 Share Posted August 9, 2021 Went through a fitting on May 17th and placed the order that day. Received the Titleist driver & 3wood along with the Cleveland wedges 6 weeks later. The PING hybrids came in July 20th. Today is Aug 9th and I am still waiting on the PING irons. Whoever said PING’s communication was poor was not correct. Poor would be a significant improvement. Quote Link to comment Share on other sites More sharing options...
3putter Posted August 9, 2021 Share Posted August 9, 2021 I ordered G425 irons -1/4" Blue dot it took 9.5 weeks. Quote Link to comment Share on other sites More sharing options...
DanTJones Posted August 9, 2021 Share Posted August 9, 2021 (edited) Ordered a single G410 5-iron nonstandard length/lie on June 5, rec’d July 20 = 45 days. Edited August 9, 2021 by DanTJones Quote Ping G400 driver Ping G410 Hybrids/Crossovers Ping G410 irons Vokey SW Scotty Newport putter Link to comment Share on other sites More sharing options...
EddieD Posted August 9, 2021 Share Posted August 9, 2021 Hi Mike, and all others. I went to a PING Demo Day at my local driving range on May 15th, I wound up ordering the whole set of G425’s - Driver SFT, 7 Wood, 4 Hybrid, and Irons 5-SW. The order went in on May 21. The Driver and Hybrid came in the first week of July, so about 7 weeks. The Irons came in about a week and a half later, and the 7 Wood came in about a week after the irons. So roughly 7 - 10 weeks to receive the full bag. And by the way, they are awesome! Although I’m still adjusting to the the new clubs I’m very happy with my purchase. Hope this helps you guys still waiting on your new PING clubs and I hope you all receive them soon - you will love them! Hit em’ straight! Thanks, Ed Quote PING G425 SFT Driver PING G425 7 Wood PING G425 4 Hybrid PING G425 Irons 5-SW Cleveland Huntington Beach 11 Putter Link to comment Share on other sites More sharing options...
H-Bomb Posted August 9, 2021 Share Posted August 9, 2021 Ordered G710s. It took 6 weeks to receive them. Quote HW Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.